BUILDING THE STANDARD ALLOWED MINUTE TO MANUFACTURING SWIMWEAR PRODUCTS IN HUNG LONG GARMENT AND SERVICE JOINT STOCK COMPANY
Abstract
Determining the time to perform sewing operations is an important basis for division of labor, line balancing, cost calculation of sewing products, production planning in industrial sewing. This article presents the results of the actual survey on the method of building the sewing time of products, thereby building the accuracy standard allowed minutes for the sewing operations of swimwear products using the Methods time measurement and General Sewing Data system in Hung Long Garment and Service Joint Stock Company.
References
M. M. Khatun, Effect of time and motion study on productivity in garment sector. International
Journal of Scientific & Engineering Research, 2014, vol. 5, no. 5, pp. 825-833.
Phan Thanh Thảo, Tạ Thị Yến, Nghiên cứu các yếu tố ảnh hưởng đến thời gian may sản phẩm áo T-Shirt, 2020.
Phan Thanh Thảo, Lê Thị Trang, Xây dựng quy trình thao tác chuẩn may các cụm chi tiết chính của sản phẩm dệt kim, 2018.
GSD Practitioner Manual. GSD Limited, 2014